Lessons Learned: Implementing BIM for the Chiltern Tunnels for High Speed 2 in the UK

Synopsis:

High Speed 2 (HS2) mandated that Building Information Modelling (BIM) processes be implemented during design and construction. Gall Zeidler Consultants (GZ) was responsible for developing the BIM Models for the portals, tunnels, and cross passages of the of the 16 km-long Chiltern twin-bore Tunnel. In addition, GZ developed the GBR for the Chiltern Tunnels and incorporated the relevant information into the Project’s BIM framework. This paper presents the implemented BIM framework, describes the modelling approach, and discusses the advantages and challenges of implementing BIM, particularly how BIM improved interface coordination and how BIM was used in feasibility assessments of different construction options.

2023 Rapid Excavation & Tunneling Conference Proceedings
June 11-14, 2023, Boston, MA (Zeidler, K., Le, Y., Kecersko, T., Gall, V.E., & Reda, D.)
Copyright holds Society for Mining, Metallurgy & Exploration (SME). Full proceedings volumes can be found on website at www.smenet.org.