Atlanta-Plane Train Tunnel West Extension Project — Progressive Design-Build Risk Management Approach
Synopsis:
Progressive Design-Build is becoming a more common delivery method in the tunneling industry. This approach allows the Owner to select a design-builder primarily based on qualification instead of lowest price. The delivery method promotes flexibility and collaboration at all levels from the initial design stage through construction. Using the example of the Atlanta Airport Plane Train Tunnel West Extension, value-added risk management was added during the initial design phase with an independent reviewer. This paper presents the independent reviewer transitioning from constructability review in the very early stages of design to independent design verification to on-site supervision during construction.
2023 Rapid Excavation & Tunneling Conference Proceedings
June 11-14, 2023, Boston, MA (Klary, W., Reda, D., Gall, V., Riahi, E., & Coibion, J.)
Copyright holds Society for Mining, Metallurgy & Exploration (SME). Full proceedings volumes can be found on website at www.smenet.org.