Shuakhevi Hydro Power Project

Adjaristsqali Georgia LLC

 

Expert Advice and Site Support:

The Shuakhevi HPP is a 185 MW hydropower project currently under construction in Adjara, Georgia. The scheme comprises two Powerhouses (175 MW and 10 MW), three dams and weirs and two transfer tunnels (4m and 5.15m span) to transfer water (6.25km, 9.2km), a headrace tunnel (16.6km, 6.22m span) to the main Powerhouse, a 250m high 6.4m diameter vertical Pressure shaft (6.4m DIA), a 800m long high-pressure headrace tunnel and a 500m long, 3.25m DIA steel lined penstock. The tunnels pass through a volcanic series consisting of basalts, andesites, ashes and mudflow sediments and breccias, partially highly impacted by tectonics, slickensides and fault gauges.

Gall Zeidler Consultants (GZ) is involved in the root cause analyses and rehabilitation of tunnel instabilities along the various tunnels. GZ provides the lead expert for the root cause investigation and the Peer Reviewer for the repair and final support measures. Furthermore, GZ provides the site Tunnel Lead engineer and a site tunnel engineer during the re-construction and repair work.

LOCATION:
Georgia
DATE:
February 2018– Ongoing
STRUCTURE:
Transfer Tunnels (6km and 9km), Headrace Tunnel (17.9km), Access Adits, Pressure Shaft (250m)
LENGTH:
6/9/17.9 km
CROSS-SECTION:
4m/6m span (transfer and headrace tunnels); 6.4m DIA Pressure Shaft
GEOLOGY:
Volcanic series including Pyroclastic sediments (tuff, ash), breccias (very sensitive to water), basalt, andesites, shallow angle fault zones; locally high content of sulfate minerals
COST:
Est. $ 400m
CLIENT:
Mott MacDonald
OWNER:
Adjaristsqali Georgia LLC