COLAS Group was commissioned by EGA GAC for the construction of a Car Dumper at Kamsar Port site for the Guinea Alumina Project.
The excavation and support for the Car Dumper structure and consisted of 3 rows of sheet piles around the excavation, with an approximate slope of 1:2 between pile rows, to excavate down to 74.85 m AD from an approximate ground level of 100 m AD.
When the excavation was near to completion, a major hydraulic ground failure followed by a landslide occurred on the East slope. The sheet piles were bent and translated over 10 m towards the excavation, and the base of the slope was subject to considerable uplift. After the landslide, the excavation was backfilled, in order to prevent any further ground movement. This measure stabilised the slope and excavation bottom heave.
Following the incident, GAC has involved Gall Zeidler Consultants (GZ) to carry an independent assessment of the Car Dumper excavation re-design, provide technical consultancy for the associated recovery works and act as independent geotechnical verification engineer. The work produced by GZ includes evaluating the geotechnical and hydrogeological information available, producing various numerical analysis models of the excavation, assessing the validity of the recovery measures, defining critical groundwater levels at different stages of the recovery work, reviewing and interpreting groundwater monitoring reports, and assessing the dewatering system in place and its decommissioning program.
Kamsar, Guinea
2017 - present
Car Dumper Excavation and Support
150 m by 300 m long footprint
Various layers of sands and normally consolidated clays with contrasting permeabilities.
EGA - GAC
EGA - GAC