• Railroad / Transit Tunnels
Show All Projects

Chicago O’Hare Airport Express Block 37

Chicago Transit Authority (CTA)

Preliminary and Detailed Design and Consulting for Subway Tunnel Waterproofing:

Gall Zeidler Consultants provided preliminary and detailed designs for the waterproofing of the new underground subway tunnels for a new Airport Express terminal station at Chicago O’Hare Airport. The station connects to the existing subway tunnels of the CTA’s Red and Blue lines.

Gall Zeidler Consultants also provided consulting and design services on the tunnel’s preliminary design that called for oblique intersections resulting in large openings. The preliminary design called for New Austrian Tunneling Method / Sequential Excavation Method (NATM / SEM) construction with systematic pre-support, shotcrete initial and permanent linings, and staged tunnel excavation..

Location:

Chicago, Illinois

Date:

2004 – 2005

Structure:

Subway Tunnels

Length:

250 feet (76 meters)

Geology:

Fill, Young Soft Clays; Groundwater Table Above the Tunnel Roof

Cost:

Approximately $250 Million

Client:

STV, Inc.

Owner:

Chicago Transit Authority (CTA)